Skip

Tickets for the SPS 2024 available now

Secure your ticket now and visit the SPS 2024 to find answers to your specific questions and discover solutions for tomorrow's challenges. In addition, the OFFICIAL DAILY / Day 1 offers a wealth of news and invites you to browse through it!

CLZ14Produkt052_Photodesk_SandraGaetke

Information about the exhibition stand

Your trade fair stand is your flagship: if you need information on assembly, dismantling, and our stand construction packages, you’re in the right place. Here, you will find all relevant documents, along with details on setup and dismantling times and stand construction.

Important documents for your trade fair appearance

Information on assembly and dismantling 

Assembly and dismantling times

The SPS 2024 will provide you with enough time to set up and dismantle your stands.

If required, an extended assembly period will be available upon request. The minimum stand size for an assembly period extension is 150 sqm/400 sqm. Please contact Andreas Haag in writing by 4 October 2024 at the latest.

Thursday, 7 November 2024 7 a.m. – 12 a.m.
Friday, 8 November 2024 12 a.m.– 12 a.m. (24 hrs)
Saturday, 9 November 2024 12 a.m.– 12 a.m. (24 hrs)
Sunday, 10 November 2024 12 a.m.– 12 a.m. (24 hrs)
Monday, 11 November 2024* 12 a.m.– 8 p.m 

*Please note that the exhibition hall must be vacated by 8.p.m. on the last day of the assembly period to allow for cleaning.

Thursday ,14 November 2024 5.15 p.m. – 12 a.m.
Friday, 15 November 2024 12 a.m. – 12 a.m. (24 hrs)
Saturday, 16 November 2024 12 a.m. – 12 a.m. (24 hrs)

Assembly and dismantling passes

Please note that an assembly and dismantling pass must be generated and presented via the STP App of NürnbergMesse for all persons staying on the Nuremberg exhibition grounds during construction and dismantling.

FAQ 

For optimized and time-accurate planning of the arrival and departure of your material and to minimize waiting times, register your vehicles and their arrival time via the new digital retrieval system TransITfair. It is not possible to enter the exhibition grounds without prior registration of a paid time slot in the TransITfair system.

For the latest information regarding vehicle access please check the Last Minute Information for exhibitors which will be sent to you approximately 4 weeks before the exhibition.

Assuming that the Technical Guidelines are complied with in the design and construction of the stand, it is not necessary to submit planning documents for single-story stand structures in the halls, provided they have a floor area of no more than 400 sqm.

Special constructions are subject to approval and costs. Special constructions include: 

  • Two-storey stand construction (see item 7 of the Stand Construction Guidelines and Notes
  • Constructions in the outdoor area 
  • Special constructions (show trucks, promotion vehicles, etc.) 
  • Cinema and auditorium areas < 100 sqm 
  • Scene areas 
  • Platforms and walk-on structures higher than 0.20 m 
  • LED walls/video walls incl. substructure or mounting materials 
  • Glass constructions 
  • Moving components 

Review and approval of structures requiring permits:
Dimensioned stand plans on a suitable scale (at least 1:100) with ground plans and elevations must be submitted in electronic form (.pdf) to the Event Engineering Department of NürnbergMesse for approval no later than six weeks before the start of construction: veranstaltungstechnik@nuernbergmesse.de.

The stand construction is not approved until the Event Engineering Department has issued a note of approval.

For further information, please see item 4.2.1 and 4.10 of the Technical Guidelines of NürnbergMesse.

For more information on the stand construction guidelines, please refer to the document Stand Construction Guidelines and Notes.

The maximum permitted construction height for single-story stand construction is 6 m. Due to structural restrictions, this height cannot be realized in all halls. The maximum construction heights of the individual halls are listed in the following table.

Hall Maximum overall height (top edge of rigging)
1 6 m (left side)
1 5.8 m (right side)
2 – 9 5.8 m
3A, 3C, 4A, 7A, 11.0 6 m
10.0 5.3 m
11.1 3.6 m

For more information on the stand construction guidelines, please refer to the document Stand Construction Guidelines and Notes.

For more information, please contact your Exhibition Manager.

Please visit the "Shop for Exhibitor Services" to place orders for marketing and advertising materials or product presentations at the forum. Moreover you can order services such as stand construction, technical connections, stand equipment, catering, personnel, logistics and much more. You will receive access to the "Shop for Exhibitor Services" as well as your stand code after booking your stand.

Long-term parking permits for exhibitors valid for the duration of the trade fair can be purchased on-site at all information and service counters.

However, you also have the option of ordering long-term parking permits in advance via the "Shop for Exhibitor Services".

During set-up and dismantling, parking is free of charge (exception: parking deck/parking garage). You will find more information in our Last Minute Mailing which is expected to be available in October 2024.